GR Yaris Oi! Oi! Savaloy!

Whilst I've seen all the GR Yaris colours at one point or another, on the road, I've still near seen one in the flesh up close.

I have seen plenty of GR Yarii up close though, and up the road is a GT86 in the same colour. Looks fantastic.

I actually did originally order the Scarlet Flare, but my missus vetoed the colour... even though it looks absolutely cracking in that colour.

Nearly ordered it in the black too, I just wanted something with a bit of contrast for a change
 
I'm actually intrigued by that leftLocationOn date, being the 24th. Is this just a badly named variable, or is it waiting to ship?
 
I'm actually intrigued by that leftLocationOn date, being the 24th. Is this just a badly named variable, or is it waiting to ship?
My order was similar and date changed when it actually left factory. Also the "is visited"status changed from not visited to in transit. Think it may be just a target date initially as my GR has left location 15/07/2022 for Portbury which is still a few weeks away yet.
 
Just out of interest , when you do the chrome developer tool trick to see your order , anyone know what the URN is ? Its the number above the VIN and both are in red when the build is complete. Any significance?
 
I think it's just a reference number for the build. I've got a URN, but not a VIN.
 
Not mine, but I was close to the dealers today so I popped in... found a pearly white in the flesh... so I had a little look. Looks f'king lovely in the flesh.







Then annoyed the salesman for a bit, then asked him if they still let the demonstrator go out.

So I did.

Nice day.... still love the thing! I even saw the stop start work for a moment too!

PXL_20220701_113453277.webp


PXL_20220701_113506078.webp


PXL_20220701_113519411.webp
 
Whilst I've seen all the GR Yaris colours at one point or another, on the road, I've still near seen one in the flesh up close.

I have seen plenty of GR Yarii up close though, and up the road is a GT86 in the same colour. Looks fantastic.

I actually did originally order the Scarlet Flare, but my missus vetoed the colour... even though it looks absolutely cracking in that colour.

Nearly ordered it in the black too, I just wanted something with a bit of contrast for a change
Love my pearl white, although think the car looks great in all the colours.
 
Updated delivery date on the tracking page for me "JW1xxx order"
estimatedDeliveryToFinalDestination: "2022-09-28"

4 Weeks later, considering it went into build during the 4 week factory shutdown, I can't say that I'm surprised.
 
If I don't get a build notification in the next two weeks, it might not even arrive in October :confused:
 
Updated delivery date on the tracking page for me "JW1xxx order"
estimatedDeliveryToFinalDestination: "2022-09-28"

4 Weeks later, considering it went into build during the 4 week factory shutdown, I can't say that I'm surprised.

This is what I don't understand about mine, it's still showing as 1st September... despite going in late June.

-edit-

RIP -> 2022-09-28 as of today, though honestly it would imply it would be one of the first cars to be built post freeze... and that gives it 72 days from Monday to get from the factory to here. Pretty safe to assume it's going to take over 500 days total though.
 
Countdown app on phone updated - 78 days
514 days from order to delivery.
 
Wait, there is a countdown on the phone app?
 
This is what I don't understand about mine, it's still showing as 1st September... despite going in late June.

-edit-

RIP -> 2022-09-28 as of today, though honestly it would imply it would be one of the first cars to be built post freeze... and that gives it 72 days from Monday to get from the factory to here. Pretty safe to assume it's going to take over 500 days total though.
the Build process - I don’t understand it . I know with factory shut down , parts shortages etc , if yours went into build on 24 June , should be on the way now ? Mine was in build from 4 May and left the factory around 22 June , 4 to 6 weeks in build ?!
 
the Build process - I don’t understand it . I know with factory shut down , parts shortages etc , if yours went into build on 24 June , should be on the way now ? Mine was in build from 4 May and left the factory around 22 June , 4 to 6 weeks in build ?!
I don't understand it either, but this is my best guess ;)

I don't think a status change to "Build In Progress" means they have actually started building the car, maybe a production slot has been allocated.
Mine changed on the 24th June, during a factory shutdown. My guess is that they will start sometime on or after the 16th July.
This will "add" 3 weeks to my build time.

Looks like the factory was closed for around 3 weeks during your build.

From this page and the related content pages

Factory Shutdown for GR Yaris

May 16 (Mon), 17 (Tue), 18 (Wed), 19 (Thu), 20 (Fri)
May 25 (Wed), 26 (Thu), 27 (Fri)

June 6 (Mon), 7 (Tue), 8 (Wed), 9 (Thu), 10 (Fri)
June 17 (Fri)*1
June 20 (Mon), 21 (Tue), 22 (Wed), 23 (Thu), 24 (Fri)
June 27 (Mon), 28 (Tue), 29 (Wed), 30 (Thu), July 1 (Fri)

July 4 (Mon), 5 (Tue), 6 (Wed), 7 (Thu), 8 (Fri)
July 11 (Mon), 12 (Tue), 13 (Wed), 14 (Thu), 15 (Fri)

Note
*1 Production suspension for the second shift only
 
I don't understand it either, but this is my best guess ;)

I don't think a status change to "Build In Progress" means they have actually started building the car, maybe a production slot has been allocated.
Mine changed on the 24th June, during a factory shutdown. My guess is that they will start sometime on or after the 16th July.
This will "add" 3 weeks to my build time.

Looks like the factory was closed for around 3 weeks during your build.

From this page and the related content pages

Factory Shutdown for GR Yaris

May 16 (Mon), 17 (Tue), 18 (Wed), 19 (Thu), 20 (Fri)
May 25 (Wed), 26 (Thu), 27 (Fri)

June 6 (Mon), 7 (Tue), 8 (Wed), 9 (Thu), 10 (Fri)
June 17 (Fri)*1
June 20 (Mon), 21 (Tue), 22 (Wed), 23 (Thu), 24 (Fri)
June 27 (Mon), 28 (Tue), 29 (Wed), 30 (Thu), July 1 (Fri)

July 4 (Mon), 5 (Tue), 6 (Wed), 7 (Thu), 8 (Fri)
July 11 (Mon), 12 (Tue), 13 (Wed), 14 (Thu), 15 (Fri)

Note
*1 Production suspension for the second shift only
I don't understand it either, but this is my best guess ;)

I don't think a status change to "Build In Progress" means they have actually started building the car, maybe a production slot has been allocated.
Mine changed on the 24th June, during a factory shutdown. My guess is that they will start sometime on or after the 16th July.
This will "add" 3 weeks to my build time.

Looks like the factory was closed for around 3 weeks during your build.

From this page and the related content pages

Factory Shutdown for GR Yaris

May 16 (Mon), 17 (Tue), 18 (Wed), 19 (Thu), 20 (Fri)
May 25 (Wed), 26 (Thu), 27 (Fri)

June 6 (Mon), 7 (Tue), 8 (Wed), 9 (Thu), 10 (Fri)
June 17 (Fri)*1
June 20 (Mon), 21 (Tue), 22 (Wed), 23 (Thu), 24 (Fri)
June 27 (Mon), 28 (Tue), 29 (Wed), 30 (Thu), July 1 (Fri)

July 4 (Mon), 5 (Tue), 6 (Wed), 7 (Thu), 8 (Fri)
July 11 (Mon), 12 (Tue), 13 (Wed), 14 (Thu), 15 (Fri)

Note
*1 Production suspension for the second shift only
Hadn’t considered that “ build in progress “ could just mean a build slot has been allocated to a particular order number as you suggest But the physical build of the car may not have started .
 
I'm pretty sure that's the state mine is in. I have a J number in the main response, but no VIN. That'd imply it was going to build, rather than has been built.
 